The Construction Management Process

Construction Management Process

Your stress-free guide to construction management success! Streamline processes and boost project efficiency effortlessly.

Overview

If you’re starting a construction project, whether it’s a remodel or a brand-new build, you already know it’s a big undertaking. As a business owner, understanding how construction management works can help you make informed decisions, stay on budget, and avoid headaches.

Construction management is the backbone of any successful project. From the initial planning stages to the final closeout, a well-managed construction process ensures that your project stays on track, within budget, and meets quality standards.

PhaseKey Activities
Planning & DesignBuilding a strong business case, performing feasibility analysis, establishing project scope
ProcurementChoosing the right delivery method, assembling the project team
PreconstructionSite surveys, permit acquisition, risk and safety strategies, scheduling
ExecutionKick-off meetings, sourcing materials and labor
Control & MonitoringComparing progress with the timeline, evaluating work quality, modifying the schedule, monitoring the project budget
CloseoutFinalizing the punch list, project commissioning, budget reporting, financial reconciliation

Each construction management phase plays a crucial role in the overall success of your construction project. This guide breaks down the construction management process in plain English, enriched with insights from our 55 years of experience, so you can better understand each stage and ensure your project is well-managed, efficient, and smooth from start to finish.

Why Construction Management Matters

1. Save Money and Time

Construction management is essential for keeping your project within budget and on time. By efficiently planning and scheduling, you can avoid costly delays and overruns. Professionals in construction management use advanced tools and methods to monitor progress and adjust as needed.

BenefitsSavings
Efficient Resource Allocation10-15% cost reduction
Timely Project Completion20-30% time savings
Minimized DelaysReduced downtime costs

2. Take Better Business Decisions

Successful construction management provides you with the data and insights needed to make informed decisions. From initial planning to project completion, having real-time information helps in assessing risks and adjusting strategies for better outcomes.

Data InsightsDecision Impact
Project TimelinesImproved scheduling
Budget TrackingBetter cost management
Risk AssessmentsProactive issue resolution

3. Enhanced Internal Communications

In construction, good communication isn’t just helpful, it’s everything. When everyone knows what’s happening, the project runs smoother.

That’s why construction management puts a big focus on keeping things clear. We’re talking daily check-ins, updated timelines, and no guessing games. At AJ Construction, we make sure the whole team, owners, subs, and vendors stay in sync from day one. Less confusion means fewer mistakes. And fewer mistakes? That means a better project outcome for everyone.

Communication MethodBenefits
Regular MeetingsUnified team goals
Progress ReportsTransparency and accountability
Issue LogsQuick resolution of problems

4. Quality Control

Let’s be honest, cutting corners doesn’t work in construction. Quality control keeps the whole project on track and up to standard. Construction management helps you stay ahead by putting solid checks in place from start to finish.

That means inspections, walkthroughs, and clear benchmarks for what “done right” looks like. For example, in our firm, we keep a close eye on the details so the final result meets, better yet, exceeds what the industry expects.

Quality MeasuresAdvantages
Regular InspectionsConsistent quality
Compliance ChecksMeets regulatory requirements
Performance MetricsHigh standards maintained

5. Risk Management

Effective risk management strategies are vital for the success of any construction project. Construction management helps identify, assess, and mitigate potential risks before they become major issues.

Risk TypeManagement Strategy
Financial RisksBudget monitoring
Safety RisksSafety protocols
Operational RisksContingency planning

Phases of Construction Project Management

1. Planning & Design Phase

a. Building a Strong Business Case

Before anyone breaks ground, you need a solid reason to move forward. That’s where a strong business case comes in; it’s your game plan for showing why the project matters.

In construction management, we use the business case to map out the big picture. What are we trying to achieve? What’s the payoff? And how much is it going to cost?

Here’s what you’ll want to cover:

  • Objectives: What’s the goal? New space, better efficiency, higher value?
  • Benefits: How will this help the business grow or improve?
  • Costs: A ballpark figure to get the conversation started.
  • ROI: What kind of return are you expecting once it’s done?

b. Performing Feasibility Analysis

Before jumping into a project, it’s smart to ask: Can we really accomplish this? That’s where a feasibility study comes in.

This step helps you determine if the project is financially, logistically, and practically feasible. We always recommend doing this early. It’s a chance to catch red flags before they turn into real problems.

A good feasibility analysis looks at things like:

  • Budget: Can the numbers work?
  • Timeline: Is the schedule realistic?
  • Site conditions: Any surprises underground or on the land?
  • Permits and zoning: Are there any big roadblocks or hurdles that can delay the project?

For example, in Florida, zoning rules can vary widely from county to county, even between municipalities. For example, Orange County may require additional setbacks for stormwater runoff compared to its neighboring county, Seminole. Therefore, it’s important that the construction management company you hire is familiar with local regulations.

At AJC, we’ve helped clients navigate these zoning layers and permit hurdles efficiently. Our team knows which local departments to contact and how to avoid common delays, such as incomplete site plans or outdated environmental reports.

AspectWhat to Consider
Financial FeasibilityCost estimates, funding sources, ROI
Technical FeasibilityAvailability of technology, required skills
Operational FeasibilityImpact on current operations, resource allocation
Legal FeasibilityZoning laws, permits, environmental regulations

c. Establishing Project Scope and Requirements

If you don’t define the scope up front, there will be misunderstandings, delays, and unnecessary costs as the project progresses. That’s why setting clear project scope and requirements is one of the first things we focus on in construction management.

Think of the scope as the blueprint for everything that’s about to happen. We make sure it spells out what the job includes, what it doesn’t, and what success looks like when it’s done.

Here’s what it should include:

  • Define Project Goals: What’s the big-picture outcome?
  • Identify Deliverables: What are we actually building or delivering?
  • Set Boundaries: What’s in scope and what’s not?
  • Develop Requirements: What does the finished product need to include or do?

Laying this all out early helps keep your team aligned and your project under control. No surprises, no scope creep, just a clear path forward.

2. Procurement Phase

a. Choosing the Right Delivery Method

Before you can build anything, you need to decide how it will be built, and that starts with choosing the right delivery method.

This choice affects everything: cost, schedule, and even how smoothly the whole process runs. At this point, we help clients choose the method that best fits their goals, budget, and team structure.

Here are a few common options to think about:

  • Design-Bid-Build (DBB): This is the traditional approach, where the design is completed first, followed by bids from contractors. Good if you want tight cost control.
  • Design-Build (DB): One team handles both design and construction. It’s faster and often more collaborative.
  • Integrated Project Delivery (IPD): Everyone’s at the table from day one, owners, designers, builders working together with shared goals and shared risks.

In Central Florida, we often recommend the Design-Build model for private commercial projects, such as self-storage facilities, and religious facilities. It reduces the delays that can come from permitting and inspection bottlenecks, especially during hurricane season when jurisdictions are overwhelmed. AJC has successfully completed multiple Design-Build projects across Orlando, saving clients time and reducing costs without sacrificing quality.

Every construction project is unique; there is no one-size-fits-all approach here. The key is selecting the structure that best fits your project, allowing you to keep everything moving in the right direction.

Delivery MethodProsCons
Design-Bid-Build (DBB)Clear separation of design and construction, competitive biddingLonger timeline, potential for disputes
Design-Build (DB)Single point of responsibility, faster deliveryLess owner control, potentially lower design quality
Construction Manager at Risk (CMAR)Early cost estimation, more control over constructionPotentially higher costs, complex risk management
Integrated Project Delivery (IPD)Collaboration, shared savingsComplex contracts, requires high trust

b. Assembling the Project Team

A construction project is only as strong as the team behind it. That’s why building the right crew from the start is key. You need a mix of pros, each with their own skill set, to get the job done right. We’ve seen firsthand how a well-rounded team keeps things moving, avoids setbacks, and delivers top results.

Consider the following key roles:

  • Project Manager: Oversees the entire project, ensuring that it stays on schedule and within budget.
  • Architects and Designers: Responsible for the design and visual aspects of the project.
  • Engineers: Handle the structural, mechanical, and electrical systems.
  • General Contractors: Oversee the construction phase, managing subcontractors and ensuring that work is performed correctly.
  • Construction Managers (CM): Act as the owner’s representative, providing expertise in construction practices and ensuring quality control.

To assemble a strong team, here’s what we suggest:

  • Define Responsibilities: Clearly outline the roles and responsibilities of each team member.
  • Check Qualifications: Ensure that all team members have the necessary certifications and experience.
  • Foster Collaboration: Encourage open communication and teamwork among all members.
  • Set Expectations: Clearly communicate project goals, deadlines, and budget constraints.

A strong team makes all the difference. Get this part right, and you’re setting your project up for success.

3. Preconstruction Phase

The preconstruction phase is essential for setting the foundation of a successful construction project.

This is the phase where everything starts to come together. You figure out the logistics, finalize the plans, and make sure your team, timeline, and budget are all aligned. We treat this stage like the foundation because if you get it right, the rest of the project runs a whole lot smoother.

Preconstruction covers things like:

  • Permits and approvals
  • Site surveys and soil tests
  • Budget refinement
  • Scheduling
  • Risk and safety planning

It’s all about being proactive instead of reactive. Get the details locked in now, and you’ll save yourself from major headaches later on.

a. Site Surveys and Permit Acquisition

The first step in the preconstruction phase is conducting thorough site surveys. They give you a full picture of what you’re working with: property lines, elevation, drainage, and any red flags on the land.

Once the site surveys are complete, you need to acquire the necessary permits for construction. This part ensures that your project complies with local building codes and zoning regulations. You’ll typically need to submit drawings and plans, and may need to go through a few rounds of review with city or county officials. It might take a little time, but trust us, it’s worth doing right. No permits, no project. Simple as that.

For example, here in Florida, building code compliance goes beyond the basics. Depending on the project’s location, due to hurricanes and tropical storms, the structure might need to meet wind load ratings for up to 140 mph or higher, especially in coastal zones. We design and build with that in mind, ensuring your plans account for wind loads, floodplain rules, and roof tie-downs right from the design stage. That’s helped our local clients avoid costly redesigns and get permits approved faster.

If you are building in Central Florida, consider reviewing the zoning and permitting resources below. It will be helpful to become familiar with their location and what they offer.

  • Orange County: Zoning Division – Zoning and Building Permits. Common questions about zoning requirements and permitting steps.
  • Lake County: Planning & Zoning Department – Information on land use, zoning maps, and development regulations.
  • Brevard County: Planning and Zoning FAQs – Common questions about zoning requirements, permitting steps, and code enforcement.
  • Osceola County: Zoning and Land Use Portal – Access property-specific zoning details, allowable uses, and compliance guidelines.

Understanding each county’s requirements early in the planning process can help avoid costly delays and ensure your project aligns with local regulations. AJC can assist with navigating these steps as part of our preconstruction services.

b. Risk and Safety Strategies

No construction site is risk-free, but with the right planning, you can effectively manage those risks.

Risk management is all about spotting issues before they become problems. Whether it’s weather delays, supply hiccups, or coordination challenges, it’s better to plan for them now than scramble later. We build risk strategies into every project timeline.

Safety goes hand-in-hand with that. You need clear rules on-site, proper training, and equipment that meets standards. That means hard hats where they belong, walk-throughs before the work starts, and protocols everyone understands. Bottom line? A safer site is a smarter site. And smart sites finish strong.

c. Scheduling and Communication Framework

A well-planned schedule is crucial for keeping your project on track. This involves setting timelines for each phase of the project and planning out the sequence of tasks. A scheduling framework helps ensure that resources are allocated efficiently and that the project progresses smoothly.

TaskStart DateEnd Date
Excavation01/01/2301/10/23
Foundation Laying01/11/2301/20/23
Framing01/21/2302/05/23

Communication is equally important. Establishing a clear communication framework ensures that everyone involved in the project is on the same page. Regular meetings, status updates, and a centralized communication platform can help streamline interactions among team members.

By focusing on these key aspects during the preconstruction phase, you can set your project up for success. Proper site surveys, efficient permit acquisition, comprehensive risk and safety strategies, and a well-defined scheduling and communication framework are essential components of effective construction management.

4. Execution Phase

The execution phase is where all your planning begins to unfold. This phase ensures your project stays on track and runs smoothly.

a. Conducting Kick-off Meetings

Kick-off meetings set the tone for the entire construction project. This initial gathering is crucial for aligning all team members and stakeholders. Here’s what you should cover in your kick-off meeting:

  1. Project Goals: Define what you aim to achieve.
  2. Roles and Responsibilities: Clarify who is responsible for what tasks.
  3. Timeline Review: Go over the project timeline to ensure everyone is aware of key milestones.
  4. Communication Plan: Establish how communication will flow throughout the project.
  5. Safety Protocols: Address safety measures and protocols to ensure a secure working environment.
AspectDetails
Project GoalsClear and specific objectives
Roles & ResponsibilitiesDefined duties for each team member
TimelineKey milestones and deadlines
Communication PlanMethods of communication
Safety ProtocolsSafety measures and plans

b. Sourcing Materials and Labor

Getting the right materials and labor is crucial. Without them, your project can face delays, increased costs, and quality issues.

Here’s what to keep in mind:

  • Material Quality: Don’t cut corners, use materials that meet spec and hold up over time.
  • Supplier Reliability: Stick with vendors who show up on time and deliver what they promise.
  • Labor Skills: Go with experienced crews who know commercial work inside and out.
  • Cost Management: It’s a balance to get the best value without sacrificing quality.
  • Inventory Management: Track what you have, what you need, and what’s on the way.
AspectDetails
Material QualityMeets project specifications
Supplier ReliabilityKnown for consistency and timeliness
Labor SkillsExperienced in the required tasks
Cost ManagementQuality balanced with cost effectiveness
Inventory ManagementEfficient tracking of materials

Good relationships and partnering with the right suppliers are crucial in the construction industry. For example, here in Florida, post-storm periods often create material shortages, especially for roofing, framing, and pre-engineered metal buildings.

We’ve built long-standing relationships with Central Florida suppliers so our clients stay ahead of the curve. We also factor in local labor availability and know when it’s smart to schedule certain trades early, like electricians or HVAC crews, who book out months in advance.

When you get sourcing right, the rest of the project runs a whole lot smoother.

c. Control & Monitoring Phase

Planning is important, but staying on track is where the real work happens. The control and monitoring phase is all about checking in, catching issues early, and making smart adjustments along the way. We keep a close eye on every aspect of the job budget, schedule, and quality to ensure nothing slips through the cracks.

This phase means:

  • Tracking progress against the timeline
  • Keeping close track of the budget
  • Making sure the work meets quality standards
  • Communicating updates clearly and often

Things change on a job site. That’s normal. The key is to catch those changes early and pivot fast. That’s how you keep the project moving and avoid major delays or surprises.

d. Comparing Progress with the Timeline

Timelines look great on paper, but how’s the project actually moving?

This step is about checking in on real progress and comparing it to the schedule you planned. We call it “looking under the hood.” We track what’s done, what’s behind, and what’s ahead so we can make adjustments before things snowball.

It’s pretty simple:

  • Take a snapshot of where things stand right now
  • Line it up with the original schedule
  • Flag anything that’s running late or early

Staying on top of this keeps your project from drifting off course. A quick check-in today can save a lot of time and money down the road.

TaskPlanned Completion DateActual Completion DateStatus
Site ExcavationMarch 1March 3Slight Delay
Foundation WorkMarch 15March 14On Time
FramingApril 10April 12Slight Delay
ElectricalMay 5May 5On Time

e. Evaluating Work Quality

Quality is key, and it can make or break a project. That’s why regular inspections are a must. We don’t wait until the end to check the work. We stay on top of it throughout the build to make sure everything meets the mark.

Here’s what we focus on:

  • Material Quality: Verify that all materials used meet the specified standards.
  • Workmanship: Conduct regular site visits to inspect the craftsmanship.
  • Compliance: Ensure that the project adheres to safety and building codes.

Keeping quality front and center means fewer do-overs, less rework, and a better-finished product. That’s how you build it right the first time.

f. Modifying the Schedule When Needed

Let’s face it, things don’t always go exactly as planned on a job site. Weather conditions change, materials get delayed, or something unexpected arises. That’s just construction. The key is being flexible and knowing when (and how) to shift gears. We keep our schedules tight, but we’re always ready to adjust when it’s prudent.

That could mean:

  • Speeding up certain tasks to make up time
  • Reallocating crews or equipment
  • Extending the timeline, but only when absolutely needed

The goal isn’t just to stay on schedule, it’s to stay smart. Adjust early, adjust wisely, and keep the project moving forward.

TaskOriginal ScheduleAdjusted ScheduleReason
Plumbing InstallationApril 20 – April 25April 22 – April 28Supplier Delay
FlooringMay 10 – May 15May 12 – May 17Weather Issues

g. Monitoring Project Budget

Budgets aren’t just numbers on a spreadsheet; they’re the backbone of your project.

At this stage, it’s all about knowing where the money’s going. If something starts creeping over budget, we catch it early and make smart moves to keep things on track.

Here’s what that usually means:

  • Match actual costs to your original projections
  • Flag any unexpected or out-of-scope expenses
  • Adjust resources or timelines if needed

When the budget is under control, everything else runs smoother. Less guesswork, less stress, and a project that wraps up right on target.

Budget CategoryBudgeted AmountActual SpentVariance
Labor$50,000$48,000-$2,000
Materials$75,000$80,000+$5,000
Permits$5,000$5,000$0
Contingency$10,000$8,500-$1,500

At AJC, one detail we always keep in mind is Florida’s sales tax implications on construction materials and equipment rentals. Timing your purchases or structuring them under the correct tax exemptions can create measurable savings. We walk clients through how to structure their purchases, especially during the early phases, to maximize these benefits. That’s part of how we help our clients keep budgets tight without compromising quality.

5. Closeout Phase

a. Finalizing the Punch List

As your construction project nears its end, there’s one last step: the punch list. This is the cleanup round. It’s where you walk through the job, spot anything that needs attention, and ensure every detail meets your expectations. We take this part seriously; it’s how we make sure the project doesn’t just finish, it finishes right.

Typical punch list items include:

  • Minor fixes and repairs
  • Paint touch-ups or trim work
  • Final hardware or fixture installs
  • Site cleanup and walkthrough prep

We’ll go over the list with our clients, line by line, and make sure it’s all buttoned up. Everything should meet the standards and expectations. There should be no loose ends and no surprises, just a clean handoff and a job well done.

b. Project Commissioning

Project commissioning is a critical step to ensure all systems and components are designed, installed, and function correctly. During this stage, various tests and inspections will be performed on:

  • HVAC systems
  • Electrical systems
  • Plumbing
  • Safety systems

The commissioning process helps verify that everything operates efficiently and safely. This step is essential for avoiding any potential issues down the road and ensures you can start using the facilities immediately.

c. Budget Reporting and Financial Reconciliation

When the build is complete, the paperwork isn’t yet finished. Now’s the time to wrap up the financial side of things. Budget reporting and reconciliation make sure everything lines up: what was spent, what was planned, and what (if anything) needs to be sorted out.

This process usually includes:

  • Final cost breakdowns
  • Comparing projected vs. actual spend
  • Resolving any open invoices or change orders
  • Closing out accounts

It’s all about clarity. You should know exactly where every dollar went and walk away with clean books and no loose ends.

To wrap up the closeout phase, here are the key takeaways that will help streamline your construction project’s closing steps:

  1. Punch List Completion: Make sure all last-minute tasks are finished to your satisfaction.
  2. Thorough Commissioning: Test all systems to ensure they function correctly.
  3. Financial Transparency: Complete financial reporting and reconciliation of the budget to understand the total costs.

By carefully navigating these stages, you can ensure your construction project concludes successfully and meets all your specifications.

Conclusion

Construction projects don’t succeed by accident; they succeed with a solid plan, a sharp team, and a steady hand guiding things from start to finish. Every phase plays a role. From laying the groundwork during planning and preconstruction to staying flexible during execution and control, it all adds up.

At AJC, we’ve seen how the right approach backed by clear communication, quality checks, smart budgeting, and solid risk planning makes the difference between a smooth build and a stressful one.

Start strong with a clear business case, a realistic scope, and a team you trust. Choose the right delivery method, get your permits locked in, and build safety into every step. Once you’re underway, keep an eye on progress, adjust when needed, and stay on top of the budget.

When it’s time to close out, wrap up that punch list, finalize the paperwork, and walk away with a project you’re proud of and lessons you can use next time. Because at the end of the day, construction management isn’t just about building something, it’s about building it right.


Construction Management in Orlando, Florida

When you partner with AJC, you’re choosing a construction management team that prioritizes your success. With decades of experience, a team of seasoned professionals, and a track record built on reliability and results, we deliver projects that are well-managed, cost-conscious, and built to stand the test of time. From pre-construction planning to final closeout, we handle the details, so you can stay focused on your business.

Let’s Build Something That Lasts

If you’re looking for a trusted construction management company in Orlando or Central Florida, reach out today to request a free estimate. Discover how AJC can bring your vision to life with clarity, confidence, and proven expertise. Call us at 407-298-1550 or fill out our contact form to schedule your free consultation.

Category: Construction Management No Comments

Author

Mike Moore

Mike Moore serves as the President of Aagaard-Juergensen, LLC, an award-winning general contracting and design-build firm based in Orlando, Florida. Since taking the helm in 2007, Mike has led the company with expertise and vision, guiding a team of skilled construction professionals in the successful planning, design, and execution of a wide range of projects. His leadership has been instrumental in driving the firm’s continued growth and success in the industry.

Comments are closed.